Sarissa Precision Ltd – Sarissa Precision Limited

Additional Track Pack: Points

Additional Track Pack: Points - Main image
$6.21 $9 In stock

Category: MDF terrain

This set of additional track contains two sets of points, enabling you to split your track to the left and to the right.

Supplied unassembled and unpainted in kit form with full instructions.

Any models or accessories shown are for scale purposes only and are not included.

Dimensions L270 x W130mm (approx.)
Product Features
Material MDF
Contents 1x left curve 1x right curve
Twitter
Before you pay

Check the method and total at checkout.

When it ships

Allow for processing time as well as the journey to you.

Standard Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

Express Shipping: Handling (business days) 0–1; Transit (business days) 7–15.

View policy
If you need a refund

Keep your order number and contact the store to start.

Please contact us for the refund processing timeframe before returning an item.

View policy
Delivery costs

Review the cost for your destination and chosen service.

Standard Shipping · United States: $0.00

Express Shipping · United States: $3.99

View policy
Returning an item

Check the return conditions before sending anything back.

United States · Return window (days after delivery): 30. Return method: By mail. Return postage: Seller pays.

View policy

Customer Reviews (4.8 / 5 · 5 reviews)

Christopher S. ★★★★★

I was pleasantly surprised by how clearly the assembly instructions walk you through each step, making these track points easy to put together even for a beginner. The left and right splitting works perfectly, and the unpainted MDF has a nice, sturdy feel that should look great once I add my own col

Ava ★★★★★

The instructions are clear enough that even a novice like me got both points built in one evening. They click onto my existing track perfectly and give me the layout flexibility I was hoping for. A solid addition for anyone expanding their rail network.

Zoe ★★★★★

Assembling the left-hand and right-hand points took me an evening, but the instructions were clear enough and now my loop has two proper branch-offs. The MDF cuts fit together snugly, so no wobbly joins where trains pass over.